Abstract: A 20 in huainan MWP is based on distributed photovoltaic power generation project, adopting the software PKPM the pv calculation and analysis framework, research, under the same load conditions using aluminum alloy stents or steel impact on the project cost.According to the analysis results provide conclusions for engineering